Categories
Contact Us

Tel: +0086-755-26007780
Fax: +0086-755-26007763
E-mail: sales@siosunhk.com
Add: Room 626-628, 6th Floor,WanJun Building, No.348 Ai'nan Rd, Longgang District, Shenzhen, China

Service Hotline
+86-755-26007780

News

Home > NewsContent

Georgia Harbor Authority Garden City Pier Lighting Project

Georgia State Ports Authority Selects Siosun Custom Lighting Solutions to Save 636,000 Dollars per Year。

As North America’s busiest single terminal container facility, the Garden City Terminal operates 24/7 and covers over 1,200 acres. The Georgia Ports Authority needed an energy efficient lighting solution designed to meet the challenges of its operations and high hours of usage. The existing lighting system presented many challenges for the Georgia Ports Authority —high-energy consumption, constant maintenance issues, and the system produced large amounts of spill and glare for the surrounding areas.

Georgia Harbor Authority Garden City Pier Lighting Project.png

Siosun’s Green Generation Lighting was the cost effective, environmentally responsible lighting solution for the Garden City Terminal. Energy consumption was reduced by 65%, annual CO2 emissions were reduced by 3,569 metric tons, and maintenance costs were eliminated for 10 years. This lighting solution also comes with Siosun’s Control-Link® Controls and Monitoring system, which allows for system performance monitoring and flexible management of the facility with Control-Link’s scheduling capabilities using web-based software and a 24/7 call center.

Over the next decade, the Georgia Ports Authority will save $6,366,000 in operating costs.

详情页F.jpg

详情页F1000A.jpg


详情页F1000D.jpg

QQ图片20151019090749.png